1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Start the engine and measure the output voltage of TPS 1 and 2
at C.T. and W.O.T.
|
1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the ETC module connector.
|
3. |
Measure resistance between the ETC module terminals 1 and 2.
|
4. |
Check that the resistance is within the specification.
|
Rear Package Tray Trim Replacement
(4Door)
•
Put on gloves to protect your hands.
...
Filler-Neck Assembly Installation
1.
Install in the reverse order of removal.
Filler-neck assembly bracket
installation bolt :
7.8 ~ 11.8 N.m (0.8 ~ 1.2 kgf.m, 5.8 ...
Alternator Reassembly
1.
Reassemble in the reverse order of disassembly.
•
...