OPU Problem Inspection Procedure |
1. |
TEST OPU GROUND CIRCUIT: Measure resistance between OPU and chassis
ground using the backside of OPU harness connector as OPU side check
point. If the problem is found, repair it.
|
2. |
TEST OPU CONNECTOR: Disconnect the OPU connector and visually
check the ground terminals on OPU side and harness side for bent pins
or poor contact pressure. If the problem is found, repair it.
|
3. |
If problem is not found in Step 1 and 2, the OPU could be faulty.
If so, make sure there were no DTC's before swapping the OPU with a
new one, and then check the vehicle again. If DTC's were found, examine
this first before swapping OPU.
|
4. |
RE-TEST THE ORIGINAL OPU: Install the original OPU (may be broken)
into a known-good vehicle and check the vehicle. If the problem occurs
again, replace the original OPU with a new one. If problem does not
occur, this is intermittent problem (Refer to “Intermittent Problem
Inspection Procedure” in Basic Inspection Procedure
|
Shift Lever Components
1. Shift lever knob
2. Shift lever assembly
3. Shift cable assembly
4. Select cable assembly
5. Retainer
...
Heated Oxygen Sensor (HO2S) Circuit Diagram
(M/T)
(A/T)
...
Variable Charge Motion Actuator (VCMA) Installation
•
Install the component with the specified torques.
•
...