|
1. |
Install the control cable (B) and clip (A) on the bracket.
|
2. |
Install the washer (B) and pin (A).
|
3. |
Tighten the nut (B) after install the retainer (A).
|
4. |
Install the cable socket (A) on the shift lever assembly.
|
5. |
Install the shift cable (B) and clip (A).
|
6. |
Shift lever to "3rd".
|
7. |
Install the snap pin (A) after install the select cable (B).
|
8. |
Install the floor console assembly.
(Refer to Body - " Floor Console")
|
9. |
Install the battery and battery tray.
(Refer to Engine Electrical System - "Battery")
|
10. |
Install the air cleaner assembly.
(Refer to Engine Electrical System - "Battery")
|
Starter Installation
1.
Install in the reverse of removal.
...
ECM Problem Inspection Procedure
1.
TEST ECM GROUND CIRCUIT: Measure resistance between ECM and chassis
ground using the backside of ECM harness connector as ECM side check
point. If the problem is fo ...
Front Body
Front Body A
* These dimensions indicated in this figure are
actual-measurement dimensions. [ Unit : mm (inch) ]
Front Body B
* These dimensions indicated in th ...