1. |
Measure the pressure of high pressure line by measuring voltage
output between NO.1 and NO.2 terminals.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not within specification, replace
the A/C pressure transducer.
|
Rear Package Tray Trim Component Location
(4Door)
1. Rear package tray trim
(2Door)
1. Rear package tray trim
...
Purge Control Solenoid Valve (PCSV) Description
Purge Control Solenoid Valve (PCSV) is installed on the intake manifold
and controls the evaporative purge between the canister and the intake manifold.
It is a normally closed solenoid valve ...
Alternator Inspection
[Rotor]
1.
Check that there is continuity between the slip rings (C).
2.
Check that there is no continuity between the slip ...