1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Turn the ignition switch ON.
|
3. |
Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.
|
Installation
•
Install the concentric slave cylinder bolts. Not to be
bent or twisted, Tighten them i ...
Intake Actuator Description
The intake actuator is located at the blower unit. It regulates the intake
door by the signal from the control unit. Pressing the intake selection switch
will shift between recirculation and ...