1. |
Measure the pressure of high pressure line by measuring voltage
output between NO.1 and NO.2 terminals.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not within specification, replace
the A/C pressure transducer.
|
Purge Control Solenoid Valve (PCSV) Installation
•
Install the component with the specified torques.
•
...
Shift Cable Installation
1.
Install in the reverse order of removal.
•
...
Starter Reassembly
1.
Reassemble in the reverse order of disassembly.
...