1. |
Disconnect the battery negative terminal.
|
2. |
Remove the fuse box cover.
|
3. |
Remove the starter relay (A).
|
4. |
Using an ohmmeter, check that there is continuity between each
terminal.
|
5. |
Apply 12V to terminal 85 and ground to terminal 86.
Check for continuity between terminals 30 and 87.
|
6. |
If there is no continuity, replace the starter relay.
|
7. |
Install the starter relay.
|
8. |
Install the fuse box cover.
|
Tightening Torques
Item
kgf.m
N.m
lb-ft
Positive crankcase ventilation valve installation
0.2 ~ 0.3
1.96 ~ 2.94
1.45 ~ 2.17
Canister install ...
Delivery Pipe Installation
1.
Install in the reverse order of removal.
Delivery pipe installation bolt:
18.6 ~ 23.5 N.m (1.9 ~ 2.4 kgf.m, 13.7 ~ 17.4 lb-ft)
...
Description
Component location : Manual transaxle
case
Operation principle : Back up lamp
switch is pushed by the reverse lug sliding when select arm, and switches the
back up lamp.
Funct ...