1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the PCSV connector.
|
3. |
Measure resistance between the PCSV terminals 1 and 2.
|
4. |
Check that the resistance is within the specification.
|
Component Location
1. EMS box assembly
(Engine control relay, Fuel pump relay,
Air conditioner compressor relay)
2. C/Fan 1 relay
3. C/Fan 2 relay
4. SSB 4(IG2) relay
5. Blower relay
...
Battery Removal
1.
Disconnect the battery terminals (A).
(1)
2.
Remove the air duct and air cleaner assembly.
...
Canister Close Valve (CCV) Installation
•
Install the component with the specified torques.
•
...