Kia Forte: Purge Control Solenoid Valve (PCSV) Inspection
| 1. |
Turn the ignition switch OFF.
|
| 2. |
Disconnect the PCSV connector.
|
| 3. |
Measure resistance between the PCSV terminals 1 and 2.
|
| 4. |
Check that the resistance is within the specification.
|
Purge Control Solenoid Valve (PCSV) Circuit Diagram
Purge Control Solenoid Valve (PCSV) RemovalCrankshaft Inspection
1.
Check the crankshaft bearing oil clearance.
(1)
To check main bearing-to-journal oil clearance, remove
the lower crankcase and lo ...
Head Lamps Installation
1.
Install the head lamp bulbs.
2.
Connect the connectors.
3.
Install the head lamp bolts (3EA).
...
Oil Pressure Switch Inspection
1.
Check the continuity between the terminal and the body with an
ohmmeter.
If there is no continuity, replace the oil pressure switch.
...