• |
Adjust shift cable.
|
• |
Adjust throttle cable.
|
• |
Refill engine with engine oil.
|
• |
Refill transaxle with fluid.
|
• |
Refill radiator and reservoir tank with engine coolant.
|
• |
Place heater control knob on "HOT" position.
|
• |
Bleed air from the cooling system.
|
- |
Start engine and let it run until it warms up. (until the radiator
fan operates 3 or 4 times.)
|
- |
Turn Off the engine. Check the level in the radiator, add coolant
if needed. This will allow trapped air to be removed from the cooling
system.
|
- |
Put radiator cap on tightly, then run the engine again and check
for leaks.
|
• |
Clean battery posts and cable terminals with sandpaper assemble
them, then apply grease to prevent corrosion.
|
• |
Inspect for fuel leakage.
|
- |
After assemble the fuel line, turn on the ignition switch (do
not operate the starter) so that the fuel pump runs for approximately
two seconds and fuel line pressurizes.
|
- |
Repeat this operation two or three times, then check for fuel
leakage at any point in the fuel line.
|
SS-B Solenoid Valve(ON/OFF) Specifications
ON/OFF Solenoid Valve(SS-A, SS-B)
▷ Control type : Normal low type
Control pressure kpa (kgf/cm², psi)
490.33(5.0, 71.12)
Internal resistance(Ω ...
Engine coolant
The high-pressure cooling system has a reservoir filled with year-round antifreeze
coolant. The reservoir is filled at the factory.
Check the antifreeze protection and coolant level at least once a ...
Description
Automatic transaxle system relies on various measurement data to determine
the current control status and extrapolate the necessary compensation values.
These values are used to control the a ...