Description
The charging system included a battery, an alternator with a built-in
regulator, and the charging indicator light and wire.
The Alternator has eight built-in diodes, each rectifying AC curre ...
Parking Brake Cable Installation
1.
Install the parking brake cable (A).
Tightening torque :
8.8 ~ 14.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~ 10.1 lb-ft)
...
Head Lamp Leveling Actuator Inspection with GDS
Initialization and diagnosis sequence by using GDS equipment.
Below content summarize the procedure for A/S using GDS.
No.
Procedure
1
Locate vehicle to flat ...