Smart Key Unit Installation
Smart Key Unit
1.
Install the smart key unit and RF receiver.
2.
Connect the connector and install the smart key unit.
...
Accelerator Pedal Installation
1.
Install in the reverse order of removal.
Accelerator pedal module installation
nut:
12.8 ~ 15.7 N.m (1.3 ~ 1.6 kgf.m, 9.4 ~ 11. ...
Canister Close Valve (CCV) Description
Canister Close Valve (CCV) is normally open and is installed on the canister
ventilation line. It seals evaporative emission control system by shutting the
canister from the atmosphere during ...