1. |
Connect the AVN head unit connectors and cables.
|
2. |
Install the AVN head unit.
|
3. |
Install the airvent ducts and fascia panel.
|
4. |
Connect the negative (-) battery terminal.
|
Canister Close Valve (CCV) Installation
•
Install the component with the specified torques.
•
...
Power Window Switch Inspection
Power Window Main Switch Inspection
1.
Disconnect the negative (-) battery terminal.
2.
Remove the front door trim.
(Refer to Body - ...
Battery Description
1.
The CMF(Closed Maintenance Free) battery is, as the name implies,
totally maintenance free and has no removable battery cell caps.
2.
Th ...