1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the CCV connector.
|
3. |
Measure resistance between the CCV terminal 1 and 2.
|
4. |
Check that the resistance is within the specification.
|
5. |
Disconnect the vapor hose connected with the canister from the
CCV.
|
6. |
Connect a vacuum pump to the nipple.
|
7. |
Ground the CCV control line and apply battery voltage to the CCV
power supply line.
|
8. |
Apply vacuum and check the valve operation.
|
Under Body
Projected Dimensions
* These dimensions indicated in this figure are
actual-measurement dimensions. [ Unit : mm (inch) ]
Actual-Measurement Dimensions
...
Airbag Disposal
Special tool required
Deployment tool 0957A-34100A
Before scrapping any airbags or side airbags (including those in a whole
vehicle to be scrapped), the airbags or side airbags ...
SS-B Solenoid Valve(ON/OFF) Inspection
1.
Turn ignition switch OFF.
2.
Disconnect the Solenoid valve connector.
3.
Measure resistance between sensor ...