Kia Forte: Purge Control Solenoid Valve (PCSV) Inspection
| 1. |
Turn the ignition switch OFF.
|
| 2. |
Disconnect the PCSV connector.
|
| 3. |
Measure resistance between the PCSV terminals 1 and 2.
|
| 4. |
Check that the resistance is within the specification.
|
Purge Control Solenoid Valve (PCSV) Circuit Diagram
Purge Control Solenoid Valve (PCSV) RemovalInspection
Lighting Switch Inspection
With the multifunction switch in each position, make sure that continuity
exists between the terminals below. If continuity is not as specified, replace
the mul ...
Heated Oxygen Sensor (HO2S) Specification
HO2S [Bank 1/Sensor 1] (Linear type)
Item
Specification
Heater Resistance (Ω)
2.4 ~ 4.0 [20°C(68°F)]
HO2S [Bank 1/Sensor 2] (Binary type)
...
Audio Remote Control Inspection
1.
Check for resistance between terminals in each switch position.
[Audio (LH)]
Switch
Connector
terminal
Resista ...