Kia Forte: 26 Brake Control Solenoid Valve(26/B_VFS) Inspection
| 1. |
Turn ignition switch OFF.
|
| 2. |
Disconnect the Solenoid valve connector.
|
| 3. |
Measure resistance between sensor signal terminal and sensor ground
terminal.
|
| 4. |
Check that the resistance is within the specification.
(Refer to 26 Brake Control Solenoid Valve - "Specifications")
|
26 Brake Control Solenoid Valve(26/B_VFS) RemovalFront Seat Belt Pretensioner Component Location
(4Door, 5Door)
1. Front seat belt pretensioner
...
Smart Key Diagnostic Inspection
Self Diagnosis With GDS
Smart key system defects can be quickly diagnosed with the GDS. GDS operates
actuator quickly to monitor, input/output value and self diagnosis.
The following thr ...
Front Strut Assembly Inspection
1.
Check the strut bearing for wear and damage.
2.
Check the spring upper and lower seat for damage and deterioration.
3.
...