Delivery Pipe Installation
1.
Install in the reverse order of removal.
Delivery pipe installation bolt:
18.6 ~ 23.5 N.m (1.9 ~ 2.4 kgf.m, 13.7 ~ 17.4 lb-ft)
...
Shift Lever Removal
1.
Remove the floor console assembly.
(Refer to Body - "Floor Console")
2.
Remove the air duct.
3.
...
Automatic transaxle operation
The automatic transaxle has 6 forward speeds and one reverse speed. The individual
speeds are selected automatically, depending on the position of the shift lever.
✽ NOTICE
The first few ...